[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-721734":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},721734,401,3,"判断题","人工拆除建筑施工,拆除梁或悬挑构件时,应采取有效的下落控制措施,方可切断两端的支撑。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"人工拆除建筑墙体时,不得采用掏掘或推倒的方法。拆除梁或悬挑构件时,应采取有效的塌落控制措施,方可切断两端的支撑。",{"id":6,"name":21,"category":22,"favorite":23},"高处安装、维护、拆除","特种作业",1]