[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-721718":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},721718,401,3,"判断题","排水立管明装安装完毕后用线坠吊直找正,配合土建堵好楼板洞。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"配合土建堵好楼板洞，以免留下安全隐患。",{"id":6,"name":21,"category":22,"favorite":23},"高处安装、维护、拆除","特种作业",1]