[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-721437":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},721437,401,3,"判断题","项目经理必须对拆除工程的安全生产负全面领导责任。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"项目经理是该项目安全生产的第一责任人，负全面领导责任。",{"id":6,"name":21,"category":22,"favorite":23},"高处安装、维护、拆除","特种作业",1]