[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-721393":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":22},721393,401,1,"单选题","施工单位应根据原设计方案或图纸按拆除解体情况,进行结构稳定性及吊装重量的精确核算,确保安全适用于()设备拆除。",[11,15,19],{"key":12,"text":13,"correct":14},"A","大型运动(需解体)",true,{"key":16,"text":17,"correct":18},"B","大型",false,{"key":20,"text":21,"correct":18},"C","通用","大型运动(需解体）设备拆除，应该根据原设计方案或图纸按拆除解体情况，进行结构稳定性及吊装重量的精确核算。",{"id":6,"name":24,"category":25,"favorite":7},"高处安装、维护、拆除","特种作业"]