[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-721333":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":22},721333,401,1,"单选题","输电线路的建设工作分准备工作、施工安装、()三个阶段。",[11,15,19],{"key":12,"text":13,"correct":14},"A","启动验收",true,{"key":16,"text":17,"correct":18},"B","现场调查",false,{"key":20,"text":21,"correct":18},"C","竣工验收","输电线路的建设工作分准备工作、施工安装、启动验收三个阶段。即工程项目建设周期可划分为：1工程项目策划和决策阶段，工程项目准备阶段，3工程项目实施阶段，工程项目竣工验收和总结评价阶段。",{"id":6,"name":24,"category":25,"favorite":7},"高处安装、维护、拆除","特种作业"]