[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-721306":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":22},721306,401,1,"单选题","大型运动设施拆除工程开工前,根据工程特点、设备、设施情况、工程量等编制()。",[11,15,18],{"key":12,"text":13,"correct":14},"A","拆除预算",false,{"key":16,"text":17,"correct":14},"B","安全交底",{"key":19,"text":20,"correct":21},"C","安全专项方案",true,"大型运动设施拆除工程开工前,根据工程特点、设备、设施情况、工程量等编制安全专项方案。",{"id":6,"name":24,"category":25,"favorite":7},"高处安装、维护、拆除","特种作业"]