[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-721298":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":22},721298,401,1,"单选题","()与分包单位必须订立临时用电管理协议,明确各方相关责任。",[11,15,19],{"key":12,"text":13,"correct":14},"A","发包单位",false,{"key":16,"text":17,"correct":18},"B","总包单位",true,{"key":20,"text":21,"correct":14},"C","建设单位","分包对应的是总包。",{"id":6,"name":24,"category":25,"favorite":7},"高处安装、维护、拆除","特种作业"]