[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-721278":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":22},721278,401,1,"单选题","装设接地线时,必须先接接地端,后接导线或地线端;拆除时的顺序()。",[11,15,18],{"key":12,"text":13,"correct":14},"A","任意",false,{"key":16,"text":17,"correct":14},"B","相同",{"key":19,"text":20,"correct":21},"C","相反",true,"装设接地线必须先接接地端，后接导线端，且必须接触良好。拆除接地线的顺序与此相反。装、拆地线均应使用绝缘棒和戴绝缘手套。",{"id":6,"name":24,"category":25,"favorite":7},"高处安装、维护、拆除","特种作业"]