[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-721270":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":22},721270,401,1,"单选题","物料提升机应按有关规定,由()单位编制安装拆卸施工方案,并有该单位分管负责人审批签字,并负责安装和拆卸。使用前与施工单位共同验收,经验收合格签字后,方可作业。",[11,15,18],{"key":12,"text":13,"correct":14},"A","建设",false,{"key":16,"text":17,"correct":14},"B","使用",{"key":19,"text":20,"correct":21},"C","产权",true,"物料提升机应按规定由其产权单位编制安装拆卸施工方案，产权单位分管负责人签字，并负责安装和拆卸；使用前与施工单位共同进行验收，经验收合格签字后，方可作业。物料提升机应有完好的的停层装置，各层联络要有明确的信号和楼层标记。物料提升机上料口应装设有连锁装置的安全门，同时采用断绳保护装置或安全停靠装置。通道口走道板应满铺并固定牢固，两侧边应设置符合要求的防护栏杆和挡脚板，并用密目安全网封闭两侧。物料提升机严禁乘人。",{"id":6,"name":24,"category":25,"favorite":7},"高处安装、维护、拆除","特种作业"]