[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-721229":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":22},721229,401,1,"单选题","总包单位必须按照规定落实对()的用电设施和日常施工的监督管理。",[11,15,19],{"key":12,"text":13,"correct":14},"A","发包单位",false,{"key":16,"text":17,"correct":18},"B","施工单位",true,{"key":20,"text":21,"correct":14},"C","建设单位","总包单位与分包单位必须订立临时用电管理协议，明确各方相关责任。分包单位必须遵守现场管理文件的约定，总包单位必须按照规定落实对分包单位的用电设施和日常施工的监督管理。",{"id":6,"name":24,"category":25,"favorite":7},"高处安装、维护、拆除","特种作业"]