[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-721217":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":22},721217,401,1,"单选题","立管暗装时,管道安装完毕应及时进行()试验,试验合格后进行隐蔽工程检查,通过此项验收应配合土建填堵管槽。",[11,15,18],{"key":12,"text":13,"correct":14},"A","严密性",false,{"key":16,"text":17,"correct":14},"B","气压",{"key":19,"text":20,"correct":21},"C","水压",true,"管道试压：铺设、暗装、保温的给水管道在隐蔽前做好单项水压试验。管道系统安装完后进行综合水压试验。水压试验时放净空气，充满水后进行加压，当压力升到规定要求时停止加压，进行检查，如各接口和阀门均无渗漏，持续到规定时间，观察其压力下降在允许范围内，通知有关人员验收，办理交接手续。然后把水泄净，被破损的镀锌层和外露丝扣处做好防腐处理，再进行隐蔽工作。",{"id":6,"name":24,"category":25,"favorite":7},"高处安装、维护、拆除","特种作业"]