[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-721184":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":22},721184,401,1,"单选题","大型广告设施基础化学锚栓植入72小时后要进行相应试验,以下()项试验必须进行。",[11,15,18],{"key":12,"text":13,"correct":14},"A","扭力",false,{"key":16,"text":17,"correct":14},"B","强度",{"key":19,"text":20,"correct":21},"C","拉拔",true,"大型广告设施基础化学锚栓植入72小时后要进行相应试验,以下哪种试验必须进行拉拔试验。",{"id":6,"name":24,"category":25,"favorite":7},"高处安装、维护、拆除","特种作业"]