[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-721182":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":22},721182,401,1,"单选题","工人在拆卸起重机横梁上的驾驶楼及其他附件时,要先(),待螺栓全部松开后再将螺栓全部拆卸下来。",[11,15,19],{"key":12,"text":13,"correct":14},"A","先拆卸立柱螺栓",false,{"key":16,"text":17,"correct":18},"B","松开横梁与立柱之间的连结螺栓",true,{"key":20,"text":21,"correct":14},"C","先松开起重机机构的平衡螺栓","",{"id":6,"name":24,"category":25,"favorite":7},"高处安装、维护、拆除","特种作业"]