[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-721150":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":22},721150,401,1,"单选题","大型运动设备(需解体)拆除时,施工单位应根据按()拆除解体情况,进行结构稳定性及吊装重量的精确核算,确保安全。",[11,15,19],{"key":12,"text":13,"correct":14},"A","原设计方案或图纸",true,{"key":16,"text":17,"correct":18},"B","设计方案或图纸",false,{"key":20,"text":21,"correct":18},"C","新设计方案或图纸","大型运动设备(需解体)拆除时，施工单位应根据按原设计方案或图纸拆除解体情况，进行结构稳定性及吊装重量的精确核算，确保安全。",{"id":6,"name":24,"category":25,"favorite":7},"高处安装、维护、拆除","特种作业"]