[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-721123":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":22},721123,401,1,"单选题","立管明装要求()立管从上至下统一吊线安装卡件,高度一致。",[11,15,19],{"key":12,"text":13,"correct":14},"A","每层两趟",false,{"key":16,"text":17,"correct":18},"B","每层所有",true,{"key":20,"text":21,"correct":14},"C","两层每趟","每层所有立管从上至下统一吊线安装卡件，高度一致。",{"id":6,"name":24,"category":25,"favorite":7},"高处安装、维护、拆除","特种作业"]