[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-721111":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":22},721111,401,1,"单选题","杆塔顶部吊离地面约()m时,应停吊进行冲击实验。",[11,15,18],{"key":12,"text":13,"correct":14},"A","1.2",false,{"key":16,"text":17,"correct":14},"B","1",{"key":19,"text":20,"correct":21},"C","0.8",true,"杆塔顶部吊离地面约0.8 m时,应停吊进行冲击实验, 全面检查各受力部位,确认无问题后方可继续起立。",{"id":6,"name":24,"category":25,"favorite":7},"高处安装、维护、拆除","特种作业"]