[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-721057":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":22},721057,401,1,"单选题","立管明装,每层每趟立管从上至下统一吊线安装卡件,高度一致;竖井内立管安装时其卡件宜设置()卡架。",[11,15,19],{"key":12,"text":13,"correct":14},"A","工字钢",false,{"key":16,"text":17,"correct":18},"B","型钢",true,{"key":20,"text":21,"correct":14},"C","角钢","立管明装，每层每趟立管从上至下统一吊线安装卡件，高度一致；竖并内立管安装时其卡件宜设置型钢卡架，将预制好的立管按编号分层排开，顺序安装，对好调直时的印记。校核预留甩口的高度、方向是否正确。支管甩口均加好临时丝堵。立管阀门安装朝向应便于操作和修理。安装完后用线坠吊直找正，配合土建堵好楼板洞。",{"id":6,"name":24,"category":25,"favorite":7},"高处安装、维护、拆除","特种作业"]