[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-721030":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":22},721030,401,1,"单选题","当给水干管采用铜管、塑料管以及热水系统干管应按设计要求采取热补偿措施。安装补偿器必须按规定做好预拉伸。待管道()安装完毕后,除去预拉伸的支撑物,调整好坡度。",[11,15,19],{"key":12,"text":13,"correct":14},"A","固定卡件",true,{"key":16,"text":17,"correct":18},"B","水平",false,{"key":20,"text":21,"correct":18},"C","滑动卡件","当给水干管采用铜管、塑料管以及热水系统干管应按设计要求采取热补偿措施。安装补偿器必须按规定做好预拉伸。待管道固定卡件安装完毕后,除去预拉伸的支撑物,调整好坡度。",{"id":6,"name":24,"category":25,"favorite":7},"高处安装、维护、拆除","特种作业"]