[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-721012":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":22},721012,401,1,"单选题","大型运动设施拆除工程安全专项方案在施工过程中,如需变更,应经()审批。",[11,15,19],{"key":12,"text":13,"correct":14},"A","原是技术负责人,变更经监理工程师",false,{"key":16,"text":17,"correct":18},"B","原是技术负责人,变更还是此技术负责人",true,{"key":20,"text":21,"correct":14},"C","原项目经理","大型运动设施拆除工程安全专项方案施工过程中,如需变更,应经原审批人批准,方可实施。",{"id":6,"name":24,"category":25,"favorite":7},"高处安装、维护、拆除","特种作业"]