[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-720999":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":22},720999,401,1,"单选题","人工拆除施工顺序为(),逐层拆除分段进行,不得垂直交叉作业。",[11,15,19],{"key":12,"text":13,"correct":14},"A","应从左至右",false,{"key":16,"text":17,"correct":18},"B","应从上至下",true,{"key":20,"text":21,"correct":14},"C","应从下至上","人工拆除施工应从上至下，逐层拆除，分段进行，不得垂直交叉作业，作业面的孔洞应封闭。",{"id":6,"name":24,"category":25,"favorite":7},"高处安装、维护、拆除","特种作业"]