[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-720876":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":22},720876,401,1,"单选题","大型运动设施拆除工程安全专项方案应经()签字批准后实施。",[11,15,19],{"key":12,"text":13,"correct":14},"A","技术负责人或监理工程师",true,{"key":16,"text":17,"correct":18},"B","项目经理",false,{"key":20,"text":21,"correct":18},"C","设备所属单位","除工程的建设单位与施工单位在签订施工合同时，应签订安全生产管理协议，明确双方的安全管理责任。建设单位、监理单位应对拆除工程施工安全负检查监督责任；施工单位应对拆除工程的安全技术管理负直接责任。所以，拆除工程安全专项方案应经技术负责人或监理工程师签字批准后实施。",{"id":6,"name":24,"category":25,"favorite":7},"高处安装、维护、拆除","特种作业"]