[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-720835":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":22},720835,401,1,"单选题","采暖、给水及热水供应系统的金属管道立管管道安装完成后,按照施工图对安装好的管道坐标、标高、坡度及预留管口尺寸进行自检,确认准确无误后调整所有支吊架固定管道、并进行()试验。",[11,15,18],{"key":12,"text":13,"correct":14},"A","通球",false,{"key":16,"text":17,"correct":14},"B","气压",{"key":19,"text":20,"correct":21},"C","水压",true,"",{"id":6,"name":24,"category":25,"favorite":7},"高处安装、维护、拆除","特种作业"]