[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-720813":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":22},720813,401,1,"单选题","起重机拆卸工程施工前焦某应编制(),卫某要进行()。",[11,15,19],{"key":12,"text":13,"correct":14},"A","安全技术方案;安全技术交底",true,{"key":16,"text":17,"correct":18},"B","安全技术交底;安全技术方案",false,{"key":20,"text":21,"correct":18},"C","安全技术方案;安全培训记录","起重机拆卸工程施工前应编制安全技术方案，要进行安全技术交底。",{"id":6,"name":24,"category":25,"favorite":7},"高处安装、维护、拆除","特种作业"]