[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-720769":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":22},720769,401,1,"单选题","拆除和被拆除建筑面积大于1000㎡的拆除工程,应编制安全()。",[11,15,19],{"key":12,"text":13,"correct":14},"A","施工组织设计",true,{"key":16,"text":17,"correct":18},"B","技术交底",false,{"key":20,"text":21,"correct":18},"C","技术方案","拆除工程开工前，应根据工程特点、构造情况、土程量及有关资料编制安全施工组织设计或方案。爆破拆除和被拆除建筑面积大于1000m2的拆除工程，应编制安全施工组织设计，被拆除建筑面积小于或等于1000m2的拆除工程，应编制安全技术方案。",{"id":6,"name":24,"category":25,"favorite":7},"高处安装、维护、拆除","特种作业"]