[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-720723":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":22},720723,401,1,"单选题","塔片就位时应先()。",[11,15,18],{"key":12,"text":13,"correct":14},"A","先左侧后右侧",false,{"key":16,"text":17,"correct":14},"B","先右侧后左侧",{"key":19,"text":20,"correct":21},"C","低侧后高侧",true,"塔片就位时应先低侧后高侧,主材与侧面大斜材未全部连接牢固前,不得在吊件上作业。",{"id":6,"name":24,"category":25,"favorite":7},"高处安装、维护、拆除","特种作业"]