[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-719959":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":22},719959,398,1,"单选题","搭设和拆除跨越电力线时应在()后进行。",[11,15,19],{"key":12,"text":13,"correct":14},"A","通电",false,{"key":16,"text":17,"correct":18},"B","停电",true,{"key":20,"text":21,"correct":14},"C","协商","搭设和拆除跨越电力线时应在停电后进行以确保安全。",{"id":6,"name":24,"category":25,"favorite":26},"登高架设","特种作业",0]