[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-718559":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":24,"analysis":25},718559,396,2,"多选题","在施工用临时线，必须做到（ ）几点。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","缆线必须完好",true,{"key":16,"text":17,"correct":14},"B","有电源开关",{"key":19,"text":20,"correct":14},"C","具有相应截面",{"key":22,"text":23,"correct":14},"D","不用铁钉或铁丝固定","ABCD","",{"id":6,"name":27,"category":28,"favorite":29},"电梯维修","特种作业",0]