[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-716190":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},716190,390,3,"判断题","由两台变压器并联运行的工厂,当负荷小时可改为一台变压器运行。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"由两台变压器并联运行的工厂，当负荷小时可改为一台变压器运行。该操作需要检查负荷分配。即拉开停运变压器断路器前要检查一号变和二号变电流，拉开断路器后要立即检查停运变压器电流为零，另一台变压器电流应为原来两变电流之和。目的是通过负荷检查防止甩负荷。",{"id":6,"name":21,"category":22,"favorite":23},"高压电工","特种作业",0]