[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-716159":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},716159,390,3,"判断题","新装电容器组投运前,应对与电容器连接的电气元件进行试验并合格。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"",{"id":6,"name":21,"category":22,"favorite":23},"高压电工","特种作业",0]