[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-715606":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":22},715606,390,1,"单选题","新电缆敷设前应做交接试验,安装竣工后和投入运行前应做()。",[11,15,18],{"key":12,"text":13,"correct":14},"A","交流耐压试验",false,{"key":16,"text":17,"correct":14},"B","直流耐压试验",{"key":19,"text":20,"correct":21},"C","交接试验",true,"新电缆敷设前应做交接试验，安装竣工后和投入运行前应做交接试验。电缆交接试验是指电力电缆线路安装完毕后，施工单位为了向运行单位验证电缆线路的可靠性进行的试验。由于附件安装和运输及现场敷设的因素，即使已通过相关试验的高压电缆的电气性能也会遭受影响。所以为了保障电网能够可靠供电，避免因微小绝缘缺陷影响整个电网，在运输敷设前要和安装竣工后和投入运行前对电网进行交接试验。",{"id":6,"name":24,"category":25,"favorite":26},"高压电工","特种作业",0]