[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-715097":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":22},715097,390,1,"单选题","装设接地线必须(),而且接触必须良好。",[11,15,19],{"key":12,"text":13,"correct":14},"A","先接接地端,后接导体(设备)端,",true,{"key":16,"text":17,"correct":18},"B","先接导体(设备)端,后接接地端,",false,{"key":20,"text":21,"correct":18},"C","先测接地电阻,再接接地端","《变电安规:4.4.9》规定：装设接地线必须先接接地端，后接导体端。拆接地线的顺序与此相反。接地线必须接触良好，连接应可靠。",{"id":6,"name":24,"category":25,"favorite":26},"高压电工","特种作业",0]