[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-713486":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":22},713486,385,1,"单选题","电气设备无论进行交接试验或预防性试验,在事先要安排好(),试验周期、项目和标准都要严格执行有关规程规定。",[11,15,19],{"key":12,"text":13,"correct":14},"A","试验计划",true,{"key":16,"text":17,"correct":18},"B","检修任务",false,{"key":20,"text":21,"correct":18},"C","检修场地","",{"id":6,"name":24,"category":25,"favorite":26},"电气试验","特种作业",0]