[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-713146":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},713146,382,3,"判断题","电缆运行人员应按要求定期到现场采用钳形电流表进行负荷测量。()",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"",{"id":6,"name":21,"category":22,"favorite":23},"电力电缆","特种作业",0]