[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-711738":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":22},711738,382,1,"单选题","电力电缆水底敷设时,()。",[11,15,18],{"key":12,"text":13,"correct":14},"A","应悬于水中",false,{"key":16,"text":17,"correct":14},"B","应埋入河床1m以下",{"key":19,"text":20,"correct":21},"C","应平放于水底",true,"",{"id":6,"name":24,"category":25,"favorite":26},"电力电缆","特种作业",0]