[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-711697":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":22},711697,382,1,"单选题","分部工程“接地系统”中包含分项工程()。",[11,15,19],{"key":12,"text":13,"correct":14},"A","接地极",true,{"key":16,"text":17,"correct":18},"B","接地电阻测试",false,{"key":20,"text":21,"correct":18},"C","户外终端","",{"id":6,"name":24,"category":25,"favorite":26},"电力电缆","特种作业",0]