[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-668564":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},668564,378,1,"单选题","电力变压器在额定电压下的冲击合闸试验要求是：在设备交接验收时应试验（）次。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","三",false,{"key":16,"text":17,"correct":14},"B","四",{"key":19,"text":20,"correct":21},"C","五",true,{"key":23,"text":24,"correct":14},"D","六","",{"id":6,"name":27,"category":28,"favorite":29},"电工（技师）","技能鉴定",0]