[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-668359":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},668359,376,3,"判断题","水内冷汽轮发电机安装结束后，应对定子、转子、水回路分别进行水压试验。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"",{"id":6,"name":21,"category":22,"favorite":23},"电工（高级）","技能鉴定",0]