[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-667329":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},667329,376,1,"单选题","同步电动机安装前应作电气和机械方向的检查，下述有关电气方面的检查内容中除( )不对外，其余都是正确的。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","了解铭牌",false,{"key":16,"text":17,"correct":14},"B","检查绕组接法，接线是否正确、紧固",{"key":19,"text":20,"correct":14},"C","电刷与滑环的接触是否良好，并测试绝缘电阻",{"key":22,"text":23,"correct":24},"D","作空载试验和负载试验",true,"",{"id":6,"name":27,"category":28,"favorite":29},"电工（高级）","技能鉴定",0]