[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-710827":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},710827,374,3,"判断题","依据《中国南方电网有限责任公司电力安全工作规程》，装设接地线、个人保安线时，应先装接地端，后装导体（线）端，拆除接地线的顺序与此相反。 ( )",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"7.4.1.5 装设接地线、个人保安线时，应先装接地端，后装导体（线）端，拆除接地线的顺序与此相反。",{"id":6,"name":21,"category":22,"favorite":23},"安规题库","特种作业",0]