[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-710688":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},710688,374,3,"判断题","依据《中国南方电网有限责任公司电力安全工作规程》，检修部分若分为几个在电气上不相连接的部分（如分段母线以隔离开关或断路器隔开分成几段），可在工作地段两端验电接地短路。 ( )",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"7.4.2.8 检修部分若分为几个在电气上不相连接的部分（如分段母线以隔离开关或断路器隔开分成几段），则各段应分别验电接地短路。厂站全部停电时，应将各个可能来电侧的部分接地短路，其余部分不必每段都装设接地线或合上接地刀闸。",{"id":6,"name":21,"category":22,"favorite":23},"安规题库","特种作业",0]