[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-710454":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":22},710454,374,1,"单选题","依据《中国南方电网有限责任公司电力安全工作规程》，电缆耐压试验分相进行时，另两相电缆应短路接地。若同一通道敷设有其他停运或未投运电力电缆，也应将其（ ）。",[11,15,18],{"key":12,"text":13,"correct":14},"A","相间短路",false,{"key":16,"text":17,"correct":14},"B","设置围栏",{"key":19,"text":20,"correct":21},"C","短路接地",true,"电缆耐压试验分相进行时，另两相电缆应短路接地。若同一通道敷设有其他停运或未投运电力电缆，也应将其短路接地。",{"id":6,"name":24,"category":25,"favorite":26},"安规题库","特种作业",0]