[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-710419":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":22},710419,374,1,"单选题","依据《中国南方电网有限责任公司电力安全工作规程》，柱上变压器台架工作，应先断开低压侧的断路器，再断开变压器台架的高压线路的隔离开关或跌落式熔断器，高低压侧验电、接地后，方可工作。若变压器的低压侧无法装设接地线，应（ ）。",[11,15,18],{"key":12,"text":13,"correct":14},"A","采用带电作业方式进行",false,{"key":16,"text":17,"correct":14},"B","采取防感应电的措施",{"key":19,"text":20,"correct":21},"C","采用绝缘遮蔽措施",true,"16.3.4 柱上变压器台架工作，应先断开低压侧的断路器，再断开变压器台架的高压线路的隔离开关或跌落式熔断器，高低压侧验电、接地后，方可工作。若变压器的低压侧无法装设接地线，应采用绝缘遮蔽措施。",{"id":6,"name":24,"category":25,"favorite":26},"安规题库","特种作业",0]