[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-710335":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":22},710335,374,1,"单选题","依据《中国南方电网有限责任公司电力安全工作规程》，利用已有杆塔立、撤杆，应检查杆塔根部及拉线和杆塔的（ ），必要时应增设临时拉线或采取其他补强措施。",[11,15,19],{"key":12,"text":13,"correct":14},"A","接地引下线",false,{"key":16,"text":17,"correct":18},"B","强度",true,{"key":20,"text":21,"correct":14},"C","电压等级","14.4.6 利用已有杆塔立、撤杆，应检查杆塔根部及拉线和杆塔的强度，必要时应增设临时拉线或采取其他补强措施。",{"id":6,"name":24,"category":25,"favorite":26},"安规题库","特种作业",0]