[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-710283":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":22},710283,374,1,"单选题","依据《中国南方电网有限责任公司电力安全工作规程》，在同杆塔多回路部分线路停电作业装设接地线时，应采取防止接地线摆动的措施，并满足（ ）的规定。",[11,15,19],{"key":12,"text":13,"correct":14},"A","作业安全距离",true,{"key":16,"text":17,"correct":18},"B","带电作业",false,{"key":20,"text":21,"correct":18},"C","间隙距离","7.4.3.7 在同杆塔多回路部分线路停电作业装设接地线时，应采取防止接地线摆动的措施，并满足表1对作业安全距离的规定。",{"id":6,"name":24,"category":25,"favorite":26},"安规题库","特种作业",0]