[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-710274":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":22},710274,374,1,"单选题","依据《中国南方电网有限责任公司电力安全工作规程》，厂站工作时，一张工作票上所列的多个检修设备，若至预定送电时一部分工作尚未完成，需继续工作而不妨碍其他送电者，应办理相应的（ ）和新的工作票，方可继续工作。",[11,15,19],{"key":12,"text":13,"correct":14},"A","工作终结",true,{"key":16,"text":17,"correct":18},"B","工作间断",false,{"key":20,"text":21,"correct":18},"C","停电申请","6.9.2 厂站工作时，一张工作票上所列的多个检修设备，若至预定送电时一部分工作尚未完成，需继续工作而不妨碍其他送电者，应办理相应的工作终结和新的工作票，方可继续工作。",{"id":6,"name":24,"category":25,"favorite":26},"安规题库","特种作业",0]