[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-710218":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":22},710218,374,1,"单选题","依据《中国南方电网有限责任公司电力安全工作规程》，整体立、撤杆塔前应进行全面检查，确保各受力、连接部位全部合格方可起吊。立、撤杆塔过程中，吊件垂直下方、受力钢丝绳的（ ）禁止有人。杆塔起立离地后，应对杆塔进行冲击试验，对各受力点处作一次全面检查，确无问题，再继续起立；杆塔起立60°后应减缓速度，注意各侧拉绳。",[11,15,19],{"key":12,"text":13,"correct":14},"A","内角侧",true,{"key":16,"text":17,"correct":18},"B","外角侧",false,{"key":20,"text":21,"correct":18},"C","引线侧","14.4.10 整体立、撤杆塔前应进行全面检查，确保各受力、连接部位全部合格方可起吊。立、撤杆塔过程中，吊件垂直下方、受力钢丝绳的内角侧禁止有人。杆塔起立离地后，应对杆塔进行冲击试验，对各受力点处作一次全面检查，确无问题，再继续起立；杆塔起立60°后应减缓速度，注意各侧拉绳。",{"id":6,"name":24,"category":25,"favorite":26},"安规题库","特种作业",0]