[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-710207":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":22},710207,374,1,"单选题","依据《中国南方电网有限责任公司电力安全工作规程》，风力大于（ ）时应停止在带电线路杆塔上的作业。",[11,15,19],{"key":12,"text":13,"correct":14},"A","5级",true,{"key":16,"text":17,"correct":18},"B","6级",false,{"key":20,"text":21,"correct":18},"C","8级","12.3.3 风力大于5级时应停止在带电线路杆塔上的作业。",{"id":6,"name":24,"category":25,"favorite":26},"安规题库","特种作业",0]