[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-665856":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},665856,373,1,"单选题","按劳动工时定额组成判断，下列()方法可以缩短辅助时间。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","缩短设备维修时间",false,{"key":16,"text":17,"correct":14},"B","增加辅助人员数量",{"key":19,"text":20,"correct":21},"C","尽可能利用机动时间交叉地进行辅助工作",true,{"key":23,"text":24,"correct":14},"D","缩短工人劳动工时","",{"id":6,"name":27,"category":28,"favorite":29},"电工（初级）","技能鉴定",0]