[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-638838":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},638838,340,1,"单选题","针对压力容器节能降耗要求，以下（ ）说法是错误的。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","在制造环节，没有必要对对影响设备或者系统能效的项目能效测试报告等进行节能监督检查",true,{"key":16,"text":17,"correct":18},"B","未经节能监督检查或者监督检查结果不符合要求的，不得出厂或者交付使用",false,{"key":20,"text":21,"correct":18},"C","在设计环节，高耗能特种设备的设计文件，应当经特种设备检验检测机构，按照有关特种设备安全技术规范和标准的规定进行鉴定",{"key":23,"text":24,"correct":18},"D","高耗能压力容器设计文件未经鉴定或者鉴定不合格的，制造单位不得进行产品制造","",{"id":6,"name":27,"category":28,"favorite":29},"D1压力管道巡检维护","特种作业",0]