[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-638829":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},638829,340,1,"单选题","当需要修改设计文件及材料代用时，必须经（ ）同意，并应出具书面文件。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","安装单位",false,{"key":16,"text":17,"correct":14},"B","建设单位",{"key":19,"text":20,"correct":21},"C","原设计单位",true,{"key":23,"text":24,"correct":14},"D","检验单位","",{"id":6,"name":27,"category":28,"favorite":29},"D1压力管道巡检维护","特种作业",0]